Lesseru – Kitale – Marich Pass Road (A1)

Lesseru – Kitale – Marich Pass Road (A1)


Project Description

FEASIBILITY  STUDY,  ENVIRONMENTAL  IMPACT  ASSESSMENT  STUDY,RESETTLEMENT ACTION PLAN, DETAILED ENGINEERING DESIGN AND TENDER DOCUMENT PREPARATION FOR LESSERU – KITALE – MARICH PASS ROAD (A1)

Preliminary and final detailed design of 156km highway earmarked for upgrading to bitumen standard and associated storm water drainage. Preparation and drafting of engineering drawings using Autodesk civil design software.

More Information
Max and Partners provided the following services:
  • Detailed design including road geometrics and pavement.
  • Alignment soils investigations and materials testing.
  • Environmental Impact Assessment
  • Design of drainage structures.
  • Design of major junctions
  • Preparation of engineering drawings using eagle point software.
  • Preparation of Factual Materials Report and Engineering report
  • Preparation of Tender documents including technical specifications
  • Preparation of Engineer’s Cost Estimate.
Project Details